Thursday, September 4, 2008

Tutorial In Class For QSD381-Measurement of Construction Works V








One of the activity involved in measurement class is for the student to do the tutorial which is whereby the student will be be measuring the works based on the drawings.

In the tutorial class, the part 6 students of AP114 will measure the surface water drainage, sewerage, roads,turfing,water reticulation,fencing and gate which all this works can be classified as External Works.

No comments: